
Browse our product development portfolio — 100+ projects delivered for hardware startups and established brands worldwide. Each case below shows a complete development journey, from concept and engineering through prototyping and manufacturing. Explore by industry or scroll through to see how our Shenzhen-based team turns ideas into market-ready products.


A smart electric bicycle with portable battery module, designed for easy swapping and urban commuting.


Using advanced robotics technology to bring more fun to children’s education.

Graphene-based heating controller is for controlling heating systems.

Meet the market demand for intelligent and interactive educational products.


Automated self-cleaning litter box with health monitoring and app connectivity.

A multi-level RF beauty device combining radio frequency therapy with ergonomic design for professional-grade skin tightening at home.

Most consumer electronics or smart device projects take 3 to 10 months from concept to mass production. This includes feasibility study, design, engineering validation, prototyping, mold development, and pilot production. Complex medical devices may take longer depending on compliance requirements.